STS-131
Flight Day 1
Launch
Payload Bay Door Opening
Ku-Band Antenna Deployment
Shuttle Robotic Arm Activation and
Payload Bay Survey
Umbilical Well and Hand-held External
Tank Photo and TV Downlink
Flight Day 2
Discovery’s Thermal Protection System
Survey with Shuttle Robotic Arm/Orbiter
Boom Sensor System (OBSS)
Extravehicular Mobility Unit checkout
Centerline Camera Installation
Orbiter Docking System Ring Extension
Orbital Maneuvering System Pod Survey
Rendezvous tools checkout
Flight Day 3
Rendezvous with the International Space
Station
Rendezvous Pitch Maneuver Photography
of Discovery’s Thermal Protection System
by Expedition 23 crew members Creamer
and Kotov
Docking to Harmony/Pressurized Mating
Adapter-2
Hatch Opening and Welcoming
Canadarm2 grapple of OBSS and handoff to
Shuttle robotic arm
Flight Day 4
Leonardo Multi-purpose Logistics Module
unberth from Discovery’s cargo bay
and installation on Harmony module’s
Earth-facing port
Leonardo activation and ingress
Spacewalk 1 preparations by Mastracchio
and Anderson
Spacewalk 1 procedure review
Spacewalk 1 campout by Mastracchio and
Anderson in the Quest airlock
Flight Day 5
Transfer of cargo from Leonardo to ISS
Spacewalk 1 by Mastracchio and Anderson
(removal of depleted Ammonia Tank
Assembly from S1 truss, replacement of a
failed gyroscope unit in the S0 truss,
retrieval of Japanese experiment from the
Japanese Exposed Facility, preparations for
replacement of batteries on the P6 truss on a
later mission)
Flight Day 6
Focused inspection of Discovery’s thermal
protection heat shield, if required
Cargo and rack transfer from Leonardo to
ISS
Spacewalk 2 procedure review
Spacewalk 2 campout by Mastracchio and
Anderson in the Quest airlock
Flight Day 7
Spacewalk 2 by Mastracchio and Anderson
(install new Ammonia Tank Assembly on
the S1 truss, temporarily stow the depleted
ammonia tank on the truss’ crew translation
cart, install micrometeoroid debris shields
on the Quest airlock)
Flight Day 8
Crew off duty time
Cargo transfer from Leonardo to ISS
Spacewalk 3 procedure review
Spacewalk 3 campout by Mastracchio and
Anderson in the Quest airlock
Flight Day 9
Spacewalk 3 by Mastracchio and Anderson
(install depleted ammonia tank back in
Discovery’s cargo bay, installation of a
lightweight plate adapter assembly on the
Dextre robot, installation of a new light on a
camera assembly on the Destiny laboratory,
installation of a camera pan and tilt
assembly on Dextre)
Cargo transfer from Leonardo to ISS
Flight Day 10
Final cargo transfer operations
Joint Crew News Conference
Crew off duty time
Flight Day 11
? Demate of the Leonardo Multi-purpose
Logistics Module from the Harmony
Earth-facing port and berthing back in
Discovery’s cargo bay
Farewells and Hatch Closure
Rendezvous Tool checkout
Flight Day 12
Discovery undocking from ISS and
flyaround
Final separation from the ISS
OBSS late inspection of Discovery’s thermal
heat shield
OBSS berth
Flight Day 13
Cabin stowage
Flight Control System checkout
Reaction Control System hot-fire test
Deorbit Preparation Briefing
Ku-band antenna stowage
Flight Day 14
Deorbit preparations
Payload Bay Door closing
Deorbit burn
KSC Landing
人気の投稿
-
2月16日(火) スピードスケート:男子500メートル: 銀メダル 長島圭一郎 銅メダル 加藤条治 09:55 - 14:00 フィギュアスケート ペアフリーTBS系 ==================================== 競技予定 大...
-
福岡ウォーカー 筑後川花火1 なんと第351回 45万人 水の祭典を締めくくるこの大花火大会は、1650年(慶安2年)の水天宮奉納花火を起源とし、久留米はもとより筑後地区一円の人々に古くから 親しまれている、名実ともに西日本一の花火大会です。 18000発を打ち上げ...
-
MISSION http://www.avexnet.or.jp/avexdb/mission/index.htm#profile MISSION - Wikipedia 日本で1998年から1999年にかけて活動した、女性アイドルグループ。 グループ名の由来は「MISSION(...
-
So' Fly GIORGIO 13オフィシャルブログ "今週はリリースラッシュです" h http://ameblo.jp/sofly-giorgio13/ 西野カナ、AYUSE KOZUE、Tiara、超新星、WISE等数々のアーティストへ...
-
12/8-11 フィギュアスケートグランプリ2011 ファイナル グランプリ2011 ファイナル カナダ 鈴木明子SP 2位発進 1 カロリーナ・コストナーCarolina KOSTNER(ITA)66.43 2 鈴木明子(JPN)61.30 http://www.yo...
-
小沢首相はなしか? 民主党代表選 9/14 小沢首相はなしか? KAN-OZAWA contest Kan-Ozawa showdown 菅直人(63)小沢一郎(68) 2006年代表選は、小沢に119対72で敗北 総ポイント1224 過半数は613ポイント 小沢側の計算、 国会...
-
Ubuntu10.10解像度変更::ATI Rageの古いカード用(笑) /xorg.conf /etc/X11/xorg.conf Section "Device" Identifier "Configured Video Devi...
-
Flight Day 1 Launch Payload Bay Door Opening Ku-Band Antenna Deployment Shuttle Robotic Arm Activation and Payload Bay Survey Umbili...
-
Adobe Creative Suite 4 Web Standardの値段でAdobe Creative Suite 5 Web Premiumが手に入る|Adobe (アドビ)ソフト通販 CS 4 Web Standardの値段でCS 5 Web Premiumが手に入る h...
-
11年度予算案29日成立へ 子ども手当「延長」の公算 毎日新聞 一般会計総額92兆4116億円の11年度予算案は29日、成立する。 民主党は10年度の子ども手当法を6カ月延長する「つなぎ法案」についても同日の衆院通過を目指す。 共産党は28日、同法案が参院で否決された場合、...